Trident
09 309 0070Book a Free Consultation
/Te Kura Kaupapa Māori

Te Kura Kaupapa Māori
O Te Raki - AC Upgrade

Full system replacement for school classrooms and offices

Trident was engaged to replace an ageing, non-operational multi-split air conditioning system serving offices and classrooms at Te Kura Kaupapa Māori O Te Raki Air Conditioning Upgrade. The existing system had reached the end of its service life, leaving parts of the school without reliable heating and cooling. The project involved replacing two multi outdoor units and their connected indoor units, while reconfiguring part of the system by replacing two indoor units with individual single split systems to better suit the school's requirements.

A modern Mitsubishi Electric solution was selected to provide reliable, energy-efficient heating and cooling while maintaining a clean external appearance. By utilising multi-split systems, multiple indoor units could be connected to a single outdoor unit, significantly reducing the number of outdoor units required around the school. New Mitsubishi Electric AP Series indoor units were installed throughout the offices and classrooms, with all refrigerant pipework, electrical cabling and controls replaced to provide a completely renewed HVAC system.

Completing the project while the school remained fully operational required careful planning and close communication with staff to minimise disruption to teaching spaces. Replacing the existing concealed services presented additional challenges, as the original pipework had been installed during the building's construction. Long refrigerant pipe runs and limited access required careful installation and commissioning, with each system charged appropriately to ensure optimum performance.

The completed installation has restored reliable heating and cooling throughout the school, providing modern, quiet and energy-efficient air conditioning for both staff and students. The upgraded system delivers year-round comfort and a reliable long-term solution tailored to the school's needs.

Project highlights

  • Replacement of an ageing, non-operational multi-split air conditioning system
  • New Mitsubishi Electric multi-split and AP Series single split heat pumps installed
  • Two multi outdoor units replaced, servicing offices and classrooms throughout the school
  • Two indoor units reconfigured from the multi system to individual single split systems
  • All refrigerant pipework, electrical cabling and controls replaced with new
  • Long refrigerant pipe runs carefully commissioned to ensure optimum system performance
  • Completed while the school remained operational, with minimal disruption to staff and students
  • Careful planning required to replace concealed services installed during original building construction
  • Modern, quiet and energy-efficient heating and cooling solution designed for long-term reliability
  • Clean, professional installation delivering year-round comfort for school staff and students

Need HVAC for your school or organisation?

Trident specialises in education sector HVAC, including system replacements and new installations. Get in touch for a free, no-obligation site assessment.